The first test-riometer in place: Oct. 2002 |
Peter Chapman (Lanc.), making the first site scans: Nov. 2002 |
|
|
|
|
|
|
|
The anchors are being placed out |
The concrete tube for the support posts (1.2 m deep) |
|
One of the array steel wire anchors (100 kg) |
More anchors... |
|
The support posts are being erected: May 2005 |
An overview of the construction works: May 19th 2005 |
|
The ground mesh is being unloaded: June 6th, 2005 |
June 7th: The ground mesh is now in place! |
|
Aug. 8Th: The first array eyebolt in place! |
Genesis' Eugene's working on the anchor wires... |
|
Antenna elements – ready for deployment... |
The definitive AIRIS array centerpoint! |
|
More antenna-parts... |
Finally! Aug. 8Th: The two diagonals are installed! |
|
Aug. 11th: The
antenna is growing now!
|
|
|
|
|
![]() Aug. 15th: Peter Chapman's searching for noise... |
![]() Aug. 15th: Eugene's working on the feeder cables... |
![]() Aug. 15th: Mark and Peter are tuning the baluns... |
![]() Aug. 15th: Peter's found the noise source! |
![]() Aug. 19th: 37.885 MHz noise! We must get rid of it! |
![]() Aug. 19th: Peter and Mark's chatting along... |
![]() Aug. 19th: Feeder cable roll-out... |
![]() Aug. 19th: Dipole isolator and bird prevention line. |
![]() Aug. 19th: The AIRIS pets. |
![]() Aug. 20th: 64 feeder cables in place. |
![]() Aug. 20th: AIRIS feeder cable entry point. |
![]() Aug. 20th: One of the 64 masthead pre-amp. boxes is being prepared. |
![]() Aug. 20th: All 64 measthead pre-amp boxes in place |
![]() Aug. 25th: The equipment hut... |
![]() Aug. 25th: Feeder cable and masthead ampl. box |
![]() Aug. 25th: Top of one dipole |
![]() Aug. 25th: The AIRIS array overview... |
![]() Aug. 25th: A closer look! The array is done now. |
![]() Jan. 17th 2006: The AIRIS reciever rack in operation |